
Pontoon Bridge For Sale
Product Description Product name: Steel pontoon bridge nickname: Prefabricated floating bridge;prefabricated highway steel bridge, steel temporary bridge, steel trestle bridge; temporary access road; temporary temporary bridge; Bailey bridge; model: 321 type; 200 type; GW D type; Commonly used...
Description
Product Description
Product name:
Steel pontoon bridge
nickname:
Prefabricated floating bridge;prefabricated highway steel bridge, steel temporary bridge, steel trestle bridge; temporary access road; temporary temporary bridge; Bailey bridge;
model:
321 type; 200 type; GW D type;
Commonly used truss piece model:
321 type Bailey panel, 200 type Bailey panel; GW D type Bailey panel, etc.
The largest single span of steel bridge design:
Around 60 meters
Standard lane width of steel bridge:
Single lane 4 meters; double lane 7.35 meters; design according to requirements.
Load class:
Class 10 for automobiles; Class 15 for automobiles; Class 20 for automobiles; Class 50 for crawlers; Class 80 for trailers; 40 tons for bicycles;AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian standard Class-40; Australian standard T44; Korean standard D24, etc.
Design:
According to the difference of span and load, choose the appropriate platoon and pontoon scheme.
Main material of steel bridge:
GB Q345B
Connection pin material:
30CrMnTi
Connecting bolt grade:
8.8 grade high-strength bolts; 10.9 grade high-strength bolts.
Bridge erection method:
Hoisting method; floating method, etc.
Installation takes time:
30-60 sunny days after abutment and other conditions are met (determined according to bridge length and site conditions)
Steel bridge features:
No need to make bridge piers, interchangeable, detachable, long life
Pass the certification:
ISO, CCIC, BV, SGS, CNAS, etc.
Executive standard:
JT-T/728-2008
Annual output:
12000 tons
Hot Tags: pontoon bridge for sale, China, suppliers, manufacturers, factory, customized, wholesale, buy, low price, for sale





