Steel Pontoon Bridge
1. No need to make bridge piers
2. Interchangeable,
3. Detachable
4. Long life
Description
Product features
1. No need to make bridge piers
2. Interchangeable,
3. Detachable
4. Long life

Product advantages
1. Simple erection and fast
2. High safety
3. Strong endurance
4. Good stability
5. Beautiful appearance
6. Wide application
7. Can be customized according to needs

Product application
It is widely used in the military transportation, emergency earthquake and flooding relief work and road, bridge, railways construction, etc.
Specification
Product name: | Steel pontoon bridge |
Nickname: | Prefabricated floating bridge; prefabricated highway steel bridge, steel temporary bridge, steel trestle bridge; temporary access road; temporary temporary bridge; Bailey bridge; |
Model: | 321 type; 200 type; GW D type; |
Commonly used truss piece model: | 321 type Bailey panel, 200 type Bailey panel; GW D type Bailey panel, etc. |
The largest single span of steel bridge design: | Around 60 meters |
Standard lane width of steel bridge: | Single lane 4 meters; double lane 7.35 meters; design according to requirements. |
Load class: | Class 10 for automobiles; Class 15 for automobiles; Class 20 for automobiles; Class 50 for crawlers; Class 80 for trailers; 40 tons for bicycles; |
Design: | According to the difference of span and load, choose the appropriate platoon and pontoon scheme. |
Main material of steel bridge: | GB Q345B |
Connection pin material: | 30CrMnTi |
Connecting bolt grade: | 8.8 grade high-strength bolts; 10.9 grade high-strength bolts. |
Surface corrosion: | Hot-dip galvanizing; paint; heavy-duty anticorrosive paint for steel structure; asphalt paint; anti-skid aggregate treatment of bridge deck, etc. |
Bridge erection method: | Hoisting method; floating method, etc. |
Installation takes time: | 30-60 sunny days after abutment and other conditions are met (determined according to bridge length and site conditions) |
Installation requires workers: | 15-20 people (determined according to site conditions) |
Equipment required for installation: | Cranes, hoists, jacks, chain hoists, welders, generators, etc. (Can be adjusted according to site conditions) |
Steel bridge features: | No need to make bridge piers, interchangeable, detachable, long life |
Pass the certification: | ISO, CCIC, BV, SGS, CNAS, etc. |
Executive standard: | JT-T/728-2008 |
manufacturer: | Zhenjiang Great Wall Heavy Industry Technology Co., Ltd. |
Annual output: | 12000 tons |
About us
Greatwall Heavy Industry considers the quality as life, always accumulates the industrial experience of production and quality, improves production technology and efficiency, follows international specifications to control the quality, improves international competition, supplies the superior products and the best service for the clients with high standard, good quality, branding strategy.
We will be in charge of customer, follow the social responsibilities, steady, pragmatic innovation.
FAQ
Q1: How long is the project warranty period?
A: Our warranty period is 12 months. Because of our reasons for quality, we bear the loss free of charge, repair or bear the cost of repair。
Q2: What is the anti-rust treatment for steel structure?
A: Anti-rust treatment of steel structure Normal anti-rust paint
Anti-rust paint with epoxy zinc primer
Hot-dip galvanization
Hop-dip galvanization + PU finish
Powder coating
Stainless steel structure: No. 301/304/316 stainless steel structure
Q3: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal.
Hot Tags: steel pontoon bridge, China, suppliers, manufacturers, factory, customized, wholesale, buy, low price, for sale





