How is bailey film installed and removed?
May 27, 2022
Bailey truss is forming a certain unit of steel frame, it can be used splice assembly into many components and equipment. Generally 3m×1.5m in length and width, bailey frame has been greatly developed in China, widely used in national defense, traffic engineering, municipal water conservancy engineering, is more widely used in China's assembly bearing components.
The steel bailey bridge of compact 200 assembly highway increases the height of truss, improves bearing capacity and stability, increases fatigue life and improves reliability. Compared with the compact 100 steel bridge, under the condition of the same combination, strength increased by 33%, the stiffness increased 2.3 times. Combination suitable for single deck width of 4.2 M, 9.14 76.2 M, span two lanes and its deck width of 7.4 M, 9.14 57.91 M span.
Another compact 100 steel bridge, which is based on the former imperial bailey truss bridge, in combination with the practical situation of China's national conditions and the development of rapid assembly Bridges, finalize the design production in 1965, and got great development in our country, widely used in national defense, combat readiness, traffic engineering, municipal water conservancy project, It has the characteristics of simple structure, convenient transportation, fast erection, large load, good interchangeability and strong adaptability.
How to install and disassemble the bailey panel?
1, workers entering the construction site must go through three-level safety education, education qualified before operation.
2, the operation should wear protective gloves, non-slip shoes, safety helmet, 2M above the correct safety belt and other protective equipment.
3, building up the homework (a special type of work), must by the professional security technology training, exam, a special operation operation certificate to work at his position. Non (special work) shall not be carried out alone without consent.

4, installation personnel must undergo a medical removal, who have high blood pressure, heart disease, epilepsy, dizzy gao or vision is not enough and not suitable for aerial work, shall not engage in high erection work.
5. Operate according to the requirements of the construction plan;
6, installation and disassembly personnel must hang the safety belt according to the requirements of high work;
7, after the assembly must be fully unloaded, loading effective overload test, and set up lightning protection device;
8, installation and removal process, it is strictly prohibited personnel under the rack body through;
9, bailey piece demolition should be in accordance with the provisions from top to bottom, objects should be put down corresponding safety measures, not to throw down any component; Operation of qualified direction without acceptance or acceptance is unqualified to enter the next process.
For more information about bailey bridge, please pay attention to Zhenjiang Great Wall Heavy Industry Technology Co., LTD
Great Wall Heavy Industry co., LTD is located in Zhenjiang city, Jiangsu Province, north of the Yangtze River, located in the Yangtze River Delta economic belt, located in shanghai-Nanjing high-speed railway, Beijing-Shanghai high-speed railway, 30 kilometers from Zhenjiang port, 50 kilometers from Changzhou Airport, 70 kilometers from Nanjing Airport, Yangtai airport. Great Wall heavy industry passed the ISO9001 quality management system certification, welding procedure and welder passed BV bureau veritas certification, raw materials and finished products have passed the SGS, CCIC, CNAS third-party certification body detection, etc.